Service equipment replacement for solar, EV, and modern electrical loads. Serving Miami and surrounding Miami-Dade County communities.

Why Miami Homes Need a Specialist

Miami panel upgrades carry an HVHZ wrinkle that the rest of South Florida does not have: any service equipment relocation or new exterior penetration has to clear Miami-Dade's wind-load and wind-driven-rain requirements, which means the meter pan, SE cable, and any exterior disconnect have to be rated and detailed for HVHZ exposure. tsmarthome holds an active Miami-Dade electrical license and we have done panel upgrades from the historic Spanish Mediterranean homes in Coral Gables and Coconut Grove to the high-rise condo stock in Brickell and Edgewater (where the building's house panel and the unit panel are two separate scopes, and the condo association has to approve any work in the common electrical room). We file the permit with the appropriate AHJ — Miami-Dade RER for unincorporated, City of Miami, Coral Gables, Miami Beach, etc. — and we coordinate the FPL service-disconnect window so the unit or home is dark for the minimum possible time.

Common Panel Upgrade Problems We See in Miami

  • HVHZ-rated meter pan and SE cable required on any exterior service relocation
  • Coral Gables and Coconut Grove historic-district architectural review on exterior equipment
  • Two-tier permitting on Brickell/Edgewater condos — unit panel vs. building house panel
  • Saltwater corrosion of pre-2010 service equipment in waterfront and ground-floor units
  • FPL interconnection backlog on Miami-area solar-ready upgrades

Our Electrical Panel Upgrade Approach

A 30-year-old 100-amp panel cannot carry a modern Florida home — central AC, induction range, EV charger, and rooftop solar will trip it or, worse, cook the bus bar. tsmarthome upgrades residential electrical service to 200- or 400-amp panels with arc-fault and ground-fault protection, surge suppression, and the dedicated solar/EV breakers most homeowners will need within five years. We pull the permit, coordinate with FPL on the meter swap, and pass the municipal final inspection in one continuous schedule so the home is not without power overnight.

Recent Miami project

Local Case Example

Coconut Grove 1956 single-family, 2,800 sqft. Replaced original 100A panel with 400A Eaton CH service, added whole-house SPD, EV circuit, and solar-ready breaker space. HVHZ-compliant meter pan; permit final in 21 days.

Our Panel Upgrade Process

1
Load calculation

NEC 220 load calc against current and planned loads (solar, EV, induction, heat pump).

2
Permit & FPL coordination

Permit pulled with the AHJ; FPL service-disconnect window scheduled.

3
Service equipment swap

Panel, meter pan, grounding electrode system, and main breaker replaced to current NEC.

4
Surge & arc-fault protection

Whole-house Type 2 SPD and AFCI/GFCI breakers installed per current code.

5
Inspection & energization

Municipal final inspection, FPL re-energization, and load testing on critical circuits.

Panel Upgrade FAQs — Miami

Can you upgrade a panel in a Brickell or Sunny Isles condo unit?

Yes, with the caveat that condo unit panel upgrades require the association to approve any work touching common electrical infrastructure (riser, sub-feeds, common house panel). We coordinate the scope letter with property management before the permit is pulled, schedule the FPL or building disconnect during the association-approved window, and document the work for the association engineer of record.

How long is the home without power?

Typically 4–8 hours during the FPL service-disconnect window. We schedule the cutover for a single business day and stage the new equipment so re-energization happens the same afternoon.

Do I need a 200-amp or 400-amp service?

A code-compliant load calc decides. Most 2,000–3,500 sqft Florida homes with central AC, electric range, and a planned EV charger land at 200 amps. Homes adding rooftop solar with battery backup or a second EV often need 400 amps, and we size for the next 10 years, not the current load.

Will my insurance premium change?

Often yes — Florida carriers price aggressively against Federal Pacific, Zinsco, and aluminum-bus panels, and a documented upgrade to a current Square D, Eaton, or Siemens panel typically lowers the dwelling premium. We provide the carrier-ready documentation as part of close-out.

Need Panel Upgrade in Miami?

Free on-site inspection, written scope, and carrier-ready documentation. No obligation.

Also serving: Boca Raton · Fort Lauderdale · Miami · West Palm Beach · Pompano Beach · Delray Beach